Reconstruction of NKHP, Krasnodar Krai

It is planned to gradually increase the transshipment capacity of NKHP PJSC up to 15.0 million tons per year and the volume of one-time storage up to 600 thousand tons as part of the Investment Program.

Stage 1:

  • Reconstruction of internal railway routes and the Verkhny park to accept railway lines passing the Novorossiysk station;
  • Construction of a device for receiving grain from vehicles;
  • Construction of an elevator with a storage capacity of 50 thousand tons.

Stage 2:

  • Construction of an additional storage for feeding grain to the port;
  • Construction of waterway station No. 3 "A" in the extension of the existing waterway station No. 3 and organization of new berths No. 22a, 23a with installation of ship-loading machines.

Stage 3:

  • Construction of grain storage with the capacity of 300 thousand tons.